1.What is Risk and mitigation plan?????
Project Manager is responsible for preparing Risk Mitigation strategy. However, he might would like to take inputs from the project team leads/members, BAs, QA, SQA
and IT infrastructure support teams to come up with an effective mitigation plan.



Mitigation has to do with devising one or more approaches to control, avoid, minimize, or otherwise mitigate the risk. Mitigation approaches may reduce the probability or the impact. It is more of a PROACTIVE initiative even before the risk becomes a problem.


The objective of a mitigation should be to ensure a risk identified doesn't occur or the least reduce it's probability of occurence.


Contingency plan on the other hand has to do with what if you are hit by the problem for the risks you could not mitigate. (This is in contrast a REACTIVE mode).

2.When to stop testing?????
When to stop testing" is one of the most difficult questions to a test engineer. The following are few of the common Test Stop criteria:


- All the high priority bugs are fixed.
- The rate at which bugs are found is too small.
- The testing budget is exhausted.
- The project duration is completed.
- The risk in the project is under acceptable limit.


3.What is bug reproduce?????
You can reproduce a Bug during Regression testing.There is nothing like a 'Reproduce' state in Bug life cycle as the Bug life cycle starts at finding a bug and end when the defect is retested successfully to close/end bug life cycle.Usually bugs can be found during regression testing which would have caused due to a fix in some other functionality.

 